The Basilica de la Sagrada Família in Barcelona, Spain, designed by the renowned architect Antoni Gaudí, was expected to be completed by 2026. This date was chosen because it marks the centenary of Gaudí’s death. However, delays caused by various factors, including the COVID-19 pandemic, have impacted the construction timeline.
It’s worth noting that while 2026 is the target for the architectural completion, additional elements and interior work might continue beyond that date.
Why is the Sagrada Família taking so long to complete?
The construction of the Basilica de la Sagrada Família in Barcelona, Spain, designed by the famous architect Antoni Gaudí, has taken an extraordinarily long time due to a combination of factors:
- Complex Design: The Sagrada Família’s design is incredibly intricate, with a multitude of detailed facades, towers, and interior elements. Gaudí’s vision was groundbreaking and often ahead of its time, which meant that the necessary construction techniques and materials were not always readily available or feasible.
- Gaudí’s Working Method: Gaudí was known for making frequent design changes during construction and working with models rather than detailed architectural plans. When some of these models were destroyed during the Spanish Civil War, deciphering Gaudí’s vision became even more challenging.
- Reliance on Donations: Initially, the construction of the Sagrada Família was largely funded by private donations. This means of financing was inconsistent and didn’t always provide the necessary resources for continuous construction.
- Interruptions: There have been various interruptions over the years, including the Spanish Civil War during which part of Gaudí’s workshop was destroyed.
- Modern Challenges: As with any long-term construction project, the basilica has faced hurdles such as obtaining the necessary permits and conforming to modern safety standards, which may not have been in place when construction began.
- Preservation of Gaudí’s Vision: Out of respect for Gaudí’s original vision, the team working on the Sagrada Família has endeavored to stay as true to his designs as possible. This dedication requires a meticulous and time-consuming approach.
- Technological Advancements: On the flip side, modern technology has also expedited some aspects of the construction process. Techniques and machinery that weren’t available in Gaudí’s time have been utilized in recent decades to accelerate progress.
- COVID-19 Pandemic: The recent global pandemic has also played a role in delaying construction, with work temporarily halted due to health and safety concerns.
Despite the prolonged construction period, the Sagrada Família remains one of the most iconic landmarks in Spain, drawing millions of visitors each year. Its lengthy completion timeline, in a way, adds to its mystique and allure.
How much will it cost to finish Sagrada Família?
There wasn’t a precise, publicly disclosed figure for the total cost to finish the Sagrada Família. The cost of construction has evolved over the decades due to various factors, including inflation, changes in labor and material costs, technological advancements, and other unforeseen challenges.
The construction of the Sagrada Família has been primarily funded by private donations and the proceeds from ticket sales to the millions of tourists who visit the basilica each year. In recent years, the influx of tourists has significantly increased the funds available for construction, leading to accelerated progress.
To get the most recent and accurate financial figures or projections regarding the completion of the Sagrada Família, one would need to refer to official sources or statements from the basilica’s construction and management team or check recent news articles and reports pertaining to the project.